Hi,
I have a problem with vMware HA Cluster resource reservation. The cluster total capacity is 13.97 Ghz but only 7.82 Ghz is available.
I didn’t understand why, if someone could explain it to me.
Also “Total slots in cluster” calculation is based on the 7.82 Ghz ( 7.82 * 1000 / 32 = 244 )
im using vMware vCenter version 6.5.
thanks.